Constructing our poly-tunnel

We took delivery of the tunnel in October 2019 but events and weather prevented us from doing any construction work until March 2020, although we did manage to clear the area in our old derelict riding arena where it was to go.  Family members had been conscripted to assist but we were only part way through laying the concrete for the base when the coronavirus lockdown started. While other people were panic buying loo rolls we were panic buying bags of cement.  Left with just the two of us we completed the base and began the construction. Here are a few photos showing our progress.

Back
finished-side
finished-side
measuring
measuring
Polytunnel0-build
Polytunnel0-build
Polytunnel1-build
Polytunnel1-build
Polytunnel2-build
Polytunnel2-build
Polytunnel3-build
Polytunnel3-build
Polytunnel4-build
Polytunnel4-build
Polytunnel5-build
Polytunnel5-build
Polytunnel6-build
Polytunnel6-build
Polytunnel7-build
Polytunnel7-build
Polytunnel8-build
Polytunnel8-build
Polytunnel9-build
Polytunnel9-build
Polytunnel10-build
Polytunnel10-build
Polytunnel11-build
Polytunnel11-build
Polytunnel14-build
Polytunnel14-build
Polytunnel15-build
Polytunnel15-build
Polytunnel16-build
Polytunnel16-build
Polytunnel17-build
Polytunnel17-build
Polytunnel18-build
Polytunnel18-build
shuttering-part2
shuttering-part2
Arena-polytunnel-prep-2019
Arena-polytunnel-prep-2019
IMG_1993
IMG_1993
polytunnel-IMG_1983
polytunnel-IMG_1983
polytunnel-IMG_1984
polytunnel-IMG_1984
polytunnel-IMG_1985
polytunnel-IMG_1985
 
 
Powered by Phoca Gallery